Hafotty |
Incline and underground working
Showing the construction of the upper part of the incline and one of the openings to the underground workings.
The workings consist of a stope which is 10 m (estimated) deep and perhaps 15 m long. The stope has not been descended because of the loose material around the pitch head and concern about the state of the roof above the stope.