Dolbebin |
Track and workings
Looking south up the track that runs alongside the workings. Much of the track is on an embankment of stacked waste which forms the wall of the trench to the left and the steep bank to the river on the right.
The workings originate in the trench and dip downwards to the left. The left wall of the trench is mostly walled-up with occasional entrances into the underground workings, one of which can just be seen (partly obscured by vegetation) at the end of the trench.
Front page | Dolbebin main page Index of mines | Area maps: Arenig, Harlech |